翻訳と辞書 |
Trianel Windpark Borkum : ウィキペディア英語版 | Trianel Windpark Borkum
Trianel Windpark Borkum (formerly Borkum West II) is a 200+200MW wind farm partially in operation near Borkum.〔(【引用サイトリンク】 Borkum West II Offshore Wind Farm, Germany )〕 The project was approved for construction in 2008 and will cost over €1 billion to construct once fully operational (€900m for phase I alone). The wind farm will have 80 wind turbines. Originally known as Borkum West II the name was changed to Trianel Windpark Borkum in early 2013. Phase 1 of the installation was completed in the 4th quarter of 2014 and consist of 40 Areva M5000-116 turbines (5MW turbines). It was connected to the grid in August 2015 〔http://www.renewablesinternational.net/germany-adds-lots-of-offshore-wind/150/435/89907/〕 Phase 2 of the installation will consist of 40 Adwen AD 5-135 (5MW turbines).〔(【引用サイトリンク】title=First Areva 5MW turbines installed at Borkum West 2 )〕 ==References==
抄文引用元・出典: フリー百科事典『 ウィキペディア(Wikipedia)』 ■ウィキペディアで「Trianel Windpark Borkum」の詳細全文を読む
スポンサード リンク
翻訳と辞書 : 翻訳のためのインターネットリソース |
Copyright(C) kotoba.ne.jp 1997-2016. All Rights Reserved.
|
|